Technical inspection of a 10GKN 4/1-55 gas-powered compressor to check it for correctness of installation on the foundation in order to determine its further operation options and extend its service life.
Operator: Saratovneftegaz PJSC
Project: Saratovneftegaz PJSC
Year of implementation: 2019.
14
Delivery of spare and replacement parts for a Type 10GK gas-powered compressor
Operator: Rosneft PJSC
Project: Otradnensky Gas Processing Plant, JSC
Year of implementation: 2020.
15
Delivery of spare and replacement parts for a Type 10GK gas-powered compressor
Operator: Rosneft PJSC, Neftegorsky Gas Processing Plant, JSC
Project: Neftegorsky Gas Processing Plant, JSC
Year of implementation: 2020.
16
Delivery of spare and replacement parts for a Type 10GK gas-powered compressor
Operator: Kazakh Neftegorsky Gas Processing Plant, TOO (Kazakhstan)
Project: Kazakh Neftegorsky Gas Processing Plant, TOO (Kazakhstan)
Inspection activities to check the position of the foundation frame of a foundation-based 10GKN gas-powered compressor for RN-Stavropolneftegaz LLC
Operator: RN-Stavropolneftegaz LLC
Project: RN-Stavropolneftegaz LLC
Year of implementation: 2019.
19
Crankshaft re-installation on new frame bearings in a 10GKN gas-powered compressor
Operator RN-Stavropolneftegaz LLC
Project: RN-Stavropolneftegaz LLC
Year of implementation: 2019.
20
Fabrication of 25MW GPU turbosets with GTU cooling systems and GTU air discharge ducts for the Novourdomskaya BCS in the Ukhta-Torzhok trunk gas pipeline system, phase 2, 3 sets
We are using cookies. By continuing to browse aorumo.ru, you acknowledge our use of your browser cookies that help us to make our site more user-friendly. However, you can still disable cookies in your browser settings.