References

01
25MW GPU materiel package delivery for the trunk gas pipeline system Ukhta-Torzhok, leg II (Yamal), Sosnogorskaya BCS
  • Operator: Gazprom PJSC, Gazprom Transgaz Ukhta LLC.
  • Project: Sosnogorskaya BCS.
  • Year of implementation: 2019.
02
25MW GPU materiel package delivery for the trunk gas pipeline system Ukhta-Torzhok, leg II (Yamal), Novomikunskaya BCS
  • Operator: Gazprom PJSC, Gazprom Transgaz Ukhta LLC.
  • Project: Novomikunskaya BCS
  • Year of implementation: 2019.
03
25MW GPU materiel package delivery for the trunk gas pipeline system Ukhta-Torzhok, leg II (Yamal), Novourdomskaya BCS
  • Operator: Gazprom PJSC, Gazprom Transgaz Ukhta LLC.
  • Project: Novourdomskaya BCS
  • Year of implementation: 2019.
04
25MW GPU materiel package delivery for the trunk gas pipeline system Ukhta-Torzhok, leg II (Yamal), Novonyuksenitskaya BCS.
  • Operator: Gazprom PJSC, Gazprom Transgaz Ukhta LLC.
  • Project: Novonyuksenitskaya BCS.
  • Year of implementation: 2019.
05
Fabrication of 25MW GPU turbosets with cooling systems
  • Operator: Gazprom PJSC, Gazprom Transgaz Ukhta LLC
  • Project: Novonyuksenitskaya BCS.
  • Year of implementation: 2020.
06
Machining of press frames no.1 and no.2
  • Operator: GAZ PJSC
  • Project: GAZ PJSC, Nizhny Novgorod
  • Year of implementation: 2020
07
Machining of labyrinth seals for the product Rotot, drawing 0-20-840-116
  • Operator: Sibur-Kstovo LLC
  • Project: Sibur-Kstovo LLC
  • Year of implementation: 2020.
08
Machining of the product Housing 7829.9000030-10SB
  • Operator: VPK LLC
  • Project: Nizhny Novgorod
  • Year of implementation: 2020.
09
Delivery of spare and replacement parts for a Type 10GK gas-powered compressor
  • Operator: Ukrnafta PAT (Ukraine)
  • Project: Ukrnafta PAT (Ukraine)
  • Year of implementation: 2021 80%
10
Delivery of spare and replacement parts for a Type 10GK gas-powered compressor (crankshafts)
  • Operator: Ukrnafta PAT (Ukraine)
  • Project: Ukrnafta PAT (Ukraine)
  • Year of implementation: may 2021 (60% implemented)
11
Machining of press frame no.3
  • Operator: GAZ PJSC
  • Project: GAZ PJSC, Nizhny Novgorod
  • Year of implementation: 2020.
12
Fabrication of a 25MW centrifugal compressor module for the Novonyuksenitskaya BCS on the Ukhta-Torzhok gas pipeline, phase 2, 4 sets
  • Operator: Gazprom PJSC, Gazprom Transgaz Ukhta LLC
  • Project: Novonyuksenitskaya BCS.
  • Year of implementation: 2020.
13
Technical inspection of a 10GKN 4/1-55 gas-powered compressor to check it for correctness of installation on the foundation in order to determine its further operation options and extend its service life.
  • Operator: Saratovneftegaz PJSC
  • Project: Saratovneftegaz PJSC
  • Year of implementation: 2019.
14
Delivery of spare and replacement parts for a Type 10GK gas-powered compressor
  • Operator: Rosneft PJSC
  • Project: Otradnensky Gas Processing Plant, JSC
  • Year of implementation: 2020.
15
Delivery of spare and replacement parts for a Type 10GK gas-powered compressor
  • Operator: Rosneft PJSC, Neftegorsky Gas Processing Plant, JSC
  • Project: Neftegorsky Gas Processing Plant, JSC
  • Year of implementation: 2020.
16
Delivery of spare and replacement parts for a Type 10GK gas-powered compressor
  • Operator: Kazakh Neftegorsky Gas Processing Plant, TOO (Kazakhstan)
  • Project: Kazakh Neftegorsky Gas Processing Plant, TOO (Kazakhstan)
  • Year of implementation: 2020.
17
Crankshaft repair for a BFV-320 compressor
  • Operator: EuroChem PJSC, Nevinnomyssky Azot JSC Branch
  • Project: Nevinnomyssky Azot JSC
  • Year of implementation: 2019.
18
Inspection activities to check the position of the foundation frame of a foundation-based 10GKN gas-powered compressor for RN-Stavropolneftegaz LLC
  • Operator: RN-Stavropolneftegaz LLC
  • Project: RN-Stavropolneftegaz LLC
  • Year of implementation: 2019.
19
Crankshaft re-installation on new frame bearings in a 10GKN gas-powered compressor
  • Operator RN-Stavropolneftegaz LLC
  • Project: RN-Stavropolneftegaz LLC
  • Year of implementation: 2019.
20
Fabrication of 25MW GPU turbosets with GTU cooling systems and GTU air discharge ducts for the Novourdomskaya BCS in the Ukhta-Torzhok trunk gas pipeline system, phase 2, 3 sets
  • Operator: Gazprom PJSC, Gazprom Transgaz Ukhta LLC
  • Project: Novourdomskaya BCS
  • Year of implementation: 2020
21
Fabrication of a 25MW centrifugal compressor module for the Novourdomskaya BCS on the Ukhta-Torzhok gas pipeline, phase 2, 3 sets
  • Operator: Gazprom PJSC, Gazprom Transgaz Ukhta LLC
  • Project: Novourdomskaya BCS
  • Year of implementation: 2020
22
Carbamate pump crankshaft repair, item no. G-902A
  • Operator: Uralchem JSC (Azot Branch in Berezniki Town)
  • Project: Azot Branch in Berezniki Town
  • Year of implementation: 2019
23
Fabrication of the GPA-16AP gas pumping unit for the Bovanenkovo Oil and Gas Condensate Field
  • Operator: Gazprom PJSC
  • Project: Bovanenkovo OGCF, Gazprom Dobycha Nadym LLC
  • Year of implementation: 2021